#construction #ramp closure #trafficRamp Closure Notification - Highway 417 Boundary RoadPlease be advised that the Hwy 417 – County Rd 41 “Boundary Rd” (I/C #96) W-N/S Ramp & N/S-E Ramp will be closed on December 10 th,2015 at 9:00pm until December 11th, 2015 at 3:00pm.
#construction #lrt #o-train #Ottawa on the Move #trafficTremblay Road fully re-opensTremblay Road between Avenue L and Avenue N will fully re-open to regular traffic today. Lane reductions have been in place since May to facilitate construction of the O-Train Confederation Line Belfast Yard maintenance and storage facility. All lanes and sidewalks on Tremblay Road will be re-opened. ...
#construciton #traffic #transitTraffic restrictions at Queen and O’Connor intersection all weekendMotorists should avoid the intersection of Queen and O’Connor streets this weekend, as lane closures will be in effect to allow for utilities relocation. The work is part of the preparation for construction of the O-Train Confederation Line Parliament Station. ...
#construction #traffic #transitAll lanes on Nicholas Street openConstruction on Nicholas Street from Highway 417 to Laurier Avenue is now complete, and the street is fully open. Nicholas was reduced to one lane in each direction in active construction zones from May to November to allow for the installation of new sewer and watermain infrastructure, as well as utility relocations. ...
Daly Avenue from Nicholas to Waller closed this SaturdayDaly Avenue from Nicholas Street to Waller Street be closed on Saturday, November 28 from 7 a.m. to 7 p.m. This closure is needed to remove heavy machinery and equipment from the excavation site of Ottawa Art Gallery Expansion and Arts Court Redevelopment project, using a mobile crane. ...
Traffic Disruptions in downtown core this Sunday due to a marchThe Ottawa Police wishes to advise motorists of possible traffic disruptions in the downtown core this Sunday, November 29, due to a march. Be advised that prior to and during this event, the following road closures will be in effect: ...
#construction #ncc #traffic #transitLocalized lane reductions on the Sir John A. Macdonald Parkway Thursday and FridayMotorists using the Sir John A. Macdonald Parkway will experience localized lane reductions in the areas of Woodroffe Avenue, ** _ the Lincoln Fields transit station and _ ** the ** _ Richmond Road overpass _ ** , on Thursday, November 26 and Friday, November 27, 2015, from 9 am to 3 pm. ...
#construction #ncc #traffic #transitAsphalt repairs on Portage Bridge this Wednesday and ThursdayOn Wednesday, November 25 and Thursday, November 26, asphalt repair work on Portage Bridge will take place between 9 am and 3 pm, weather permitting. This work will move along the bridge in order to minimize traffic disruptions. The National Capital Commission (NCC) urges motorists to exercise caution, respect work crews and equipment, and obey flag persons and signage at the site. ...
#o-trainPlanned pre-winter maintenance work shuts down O-Train Trillium Line this weekendOn Saturday, November 21 and Sunday, November 22, O-Train service on the Trillium Line will be temporarily replaced by Route 107 bus service to facilitate planned maintenance work before the winter months. The work includes the replacement of cabling and the refurbishment of a rail switch where the O-Train enters and exits the Trillium Line from Walkley Yard. ...
#byward market #rideauRideau Street from Sussex Drive to Dalhousie Street closed to all traffic this weekendRideau Street from Sussex Drive to Dalhousie Street will be closed to all traffic from Friday November 20 at 6:30 p.m. to Monday November 23 at 5 a.m., to relocate a watermain as part of O-Train Confederation Line Rideau Station construction. ...